Asked where the water goes, we said “down,” which was only half an answer. The basin floor is open gravel over soil, and in a hard rain it holds an inch for a few minutes before it drains.

You’ll also love: How to Build a Rainwater Harvesting System on a Barrel Rack, How to Build a Tractor Tire Pond with Three Solar Fountains, How to Make Glass Mosaic Stepping Stones with a Polished Face.

Our brick garden faucet is a 42-inch brick column built around an old standpipe, with a low brick basin of black pebbles at its foot and a stone cap on top.

The first course went straight onto the patio stones as they were. One rocked, so all four bricks came back up and went down again on a proper mortar bed.

Wet mortar smells like a cold basement, and a brick taps level with a dull knock. Our neighbor said the tap looked better than her kitchen, then asked if we did kitchens.

Brick column around a garden tap with a stone cap and a basin of black pebbles

Project at a glance

Active time
About 1½ days
Cure time
3 days before the cap gets weight on it
Cost
About $265
Difficulty
Moderate
Finished size
Column 12 in square, 42 in tall; basin 24 × 30 in

What the Column Is Really For

An outdoor tap gets bumped by every hose and wheelbarrow that goes past. Inside brick, the pipe can’t be knocked loose.

We expected the basin to be the easy part. It’s the part that needs planning, because a basin that can’t drain turns into a mosquito pond by midsummer.

Four bricks per course in a pinwheel leave a 4-inch square hole in the middle, just right for a pipe.

Materials & Tools

Bricks, standardAbout 115 — 64 for the column, 41 for the basin, plus spares
Mortar mix, 80 lb4 bags
Stone cap for the column1 slab, about 14 × 14 in, 1½ in thick
Stone caps for the basin wallAbout 9 pieces, 6 × 12 in
Gravel, ¾ in2 bags, 0.5 cu ft — the drain bed
Black polished pebbles2 bags, 0.5 cu ft
Brick trowel, jointer and 2-ft level1 of each
Check on Amazon
Foam pipe insulation1 length, sized to your pipe
Check on Amazon
Nitrile gloves and safety glasses1 each
Check on Amazon

Not in the $265: any plumbing changes, the topiary and its pot, a brick hammer and a mixing tub.

Freezing winters: a pipe inside brick still freezes. Where the ground freezes, the tap needs to be a frost-free hydrant, or have a shutoff and drain below the frost line; that’s a plumber’s job, done before the first brick.

How much mortar: one maker’s data sheet says an 80-pound bag lays up to 37 standard bricks, so four bags cover about 115 with a little left for the caps.

The basin floor: it drains like a small patch of our white gravel garden path, straight down through gravel into the soil.

Watch the Build

Step by Step

Step 1Get the pipe ready

Turn the water off and check the pipe and tap for drips; once the column is up, you won’t get at them again. Wrap the pipe in foam insulation from the ground to the tap.

Bare galvanized standpipe with a brass tap against a white garden wall

Step 2Lay the first course

Mix a bag of mortar with about 5 quarts of water until it holds on a trowel tipped nearly upright. Spread a ½-inch bed on solid concrete and set four bricks around the pipe in a pinwheel, 12 inches square outside.

If your patio is stones on sand, lift them and pour a small concrete pad first. A column on loose pavers leans within a season.

On a hot day, dunk the bricks in a bucket first. Dry brick pulls the water out of mortar before it can set.

Setting the first bricks in mortar around the base of the pipe

Step 3Build the column

Lay each course in the same pinwheel, turned the other way, so the joints cross. Check level on top and plumb on two faces every third course; at tap height, cut a brick to leave a notch for the tap.

Sixteen courses, with ⅜-inch joints, bring it to 42 inches. Scrape off squeezed-out mortar as you go; once it dries on a brick face, it’s there for good.

Building the brick column course by course around the standpipe

Step 4Cap the column

Spread a full bed of mortar across the top course and set the stone cap on it, centered, with an even overhang all around. Tap it level with the trowel handle.

Setting a stone cap slab onto a bed of mortar on top of the column

Step 5Build the basin wall

Lift the patio stones inside a 24 × 30 inch rectangle in front of the column. Lay a U of bricks around it, three courses high, tied into the column’s base.

Tool every joint when it’s thumbprint hard, so rain runs off instead of soaking in.

Laying the low brick wall of the basin around the column base

Step 6Cap the basin wall

Bed the stone caps on the top course with mortar, butted tight, overhanging the inside edge by ½ inch so splashes drip into the basin.

Pressing a stone cap onto the top of the basin wall

Step 7Fill the basin

Loosen the soil inside the basin, pour in 3 inches of gravel, then 2 inches of black pebbles on top.

Use pebbles at least ¾ inch across, so they can’t wash down into the gravel. Rinse them in a bucket first, or the first water through runs gray.

Pouring black polished pebbles into the brick basin

Step 8Top it off

Give the mortar 3 days before anything heavy goes on the cap. A potted boxwood clipped into a ball suits the scale.

Setting a potted boxwood topiary on the stone cap of the column

Step 9Turn it on

Open the water and let it run for a minute into the basin to check that it drains. The brick garden faucet is ready for hands, boots and the first tomatoes of the year.

Rinsing an orange under the tap of the brick garden faucet

How the Brick Garden Faucet Holds Up

The mortar joints around the tap notch are the first to crack, from water running down the pipe. Repoint them when they open, and keep the tap from dripping.

The pebbles slowly collect soil; rinse them in a bucket every year or two.

FAQ

The basin stays full of water

The soil under the gravel doesn’t drain. Dig a hole 12 inches deeper in the middle of the basin, fill it with gravel, and see if that’s enough.

White crust appeared on the bricks

That’s efflorescence, salts carried out by water. Let it dry, brush it off with a stiff dry brush, and it usually fades after the first year.

Can I use concrete block instead of brick?

Yes, and it goes up faster. Stucco or paint it afterward if you don’t like the look of bare block.

The column is leaning

The base moved. A small lean on a column this short won’t fall, but it means the footing wasn’t solid; we haven’t found a fix short of taking it down to the base and starting again.

Can I add a second tap?

Only with plumbing work before the bricks go up. Plan it at the start; adding one later means opening the column.

The neighbor’s kitchen question is still open. So far we’ve only offered to wash her oranges.