How to Build Cinder Block Deck Stairs with Cedar Treads

This post contains affiliate links. As an Amazon Associate I earn from qualifying purchases. Read the full disclosure.

Measuring from the gravel to the top of the deck boards decides every other number here. Ours came to 38⅛ inches, which is five risers of exactly one block height, 7⅝ inches each, and that’s the only reason the plan works without cutting a block.

You’ll also love: How to Lay a Slate Stepping Stone Path in a Side Yard, How to Make Lighted Stepping Stones from Giant Leaves, How to Turn a Weedy Strip into a Side Yard Paver Walkway.

The first measurement went to the top of the joists instead of the boards. On paper, the top step came out an inch and a half too short.

Our cinder block deck stairs are two stepped walls of dry-stacked block, cedar timbers slid through the block cores, and cedar boards on top: four steps, 51 inches wide. A neighbor said it looked like a giant toy set, then asked to borrow the wheelbarrow.

Blocks grind against each other with a dry scrape when you nudge them into line.

Cinder block deck stairs with cedar treads leading up to a wooden deck

Project at a glance

Active time
About 1½ days
Cure time
1 day for the block adhesive
Cost
About $540
Difficulty
Moderate
Finished size
4 steps, 51 in wide, 38 in rise to the deck

How Two Block Walls Carry the Steps

Each side wall steps down like a staircase seen from the side. The front block of every step lies on its side, so its two holes face across the stairs, and a pair of 4×4 timbers runs through them to the matching block on the other wall.

We expected to need mortar. Glued with block adhesive and sitting on packed gravel, the walls don’t move, and the timbers lock the two sides together.

Boards on top of the timbers make the walking surface. Without them, there’s a 4-inch gap down the middle of every step.

Materials & Tools

Concrete blocks, 8 × 8 × 16 in22 — 20 for the walls, 2 spare
Crushed gravel, ¾ in17 bags, 0.5 cu ft — the base
Landscape block adhesive3 tubes
Check on Amazon
Cedar 4×4, 8 ft4, cut into eight 48-in timbers
Cedar 2×6, 10 ft6, cut into twelve 51-in tread boards
Exterior screws, 3 in1-lb box
Check on Amazon
Hand tamper1
Check on Amazon
4-ft level and rubber mallet1 of each
Check on Amazon
Exterior penetrating stain1 qt
Check on Amazon
Work gloves1 pair — blocks weigh about 35 lb and scrape skin
Check on Amazon

Not in the $540: a wheelbarrow, a shovel, a saw, a drill, a handrail, and the plants.

Rules first: stairs to a deck usually fall under the building code.

The City of Saint Paul’s stair handout is typical: risers no taller than 7¾ inches, treads at least 10 inches deep, and a handrail on stairs with four or more risers. Ask your own building department before the first block goes down.

Blocks elsewhere: the same 8 × 8 × 16 blocks make the tiers of our cinder block pyramid garden, planted instead of walked on.

Watch the Build

Step by Step

Step 1Haul the blocks and lay the base

Dig out a patch 63 × 52 inches in front of the deck, 4 inches deep, and fill it with gravel in two layers, tamping each one hard. Check it with the level in both directions.

A block weighs about 35 pounds. Bring them over a few at a time in the wheelbarrow and stack them near the deck, not on the fresh base.

Wheeling a load of concrete blocks across the gravel to the deck

Step 2Start the side walls

Set the bottom course of each wall 1½ inches down into the gravel, so the first step comes out the same height as the rest. Each wall starts as a row of four blocks running from the front of the stairs back to the deck, with 36 inches clear between the walls.

Stacking the first concrete blocks against the deck

Step 3Step the walls up

Glue each course to the one below with a bead of block adhesive and add one fewer block per course: four, three, two, one. Turn the front block of every course on its side, holes facing the other wall.

Tap each block level with the mallet before the adhesive grabs.

Building up a stepped wall of concrete blocks beside the deck

Step 4Check the walls match

Lay the level across from one wall to the other at every step. Both side-laid blocks at the same step should sit at the same height, with their holes lined up.

Slide a timber through as a test before the adhesive sets. If it binds, one block needs a tap sideways.

Stepped block wall with a timber end set in a block hole

Step 5Slide in the timbers

Cut the 4×4s into 48-inch timbers and slide two through each pair of side-laid blocks, one in each hole, so about 6 inches sits inside the block at each end. Stain the cut ends first; they never see a brush again.

Sliding a cedar timber into the holes of the side-laid blocks

Step 6Screw down the treads

Lay three 51-inch 2×6s across each pair of timbers, ⅛ inch apart, with the front board overhanging the block by about an inch. Screw each board to both timbers with two screws per crossing.

Drill pilot holes near the board ends; cedar splits easily there.

Setting cedar tread boards on the timbers of a step

Step 7Finish the top step

Work up to the last step under the deck edge. Measure from each tread to the next and from the top tread to the deck; every riser should land within ⅜ inch of the others.

Fitting the last tread board below the deck edge

Step 8Plant the edges

Tuck grasses and low flowers into pots or beds along the outside of the walls. Keep them back from the treads, where they’d catch a foot.

Planting grasses and flowers beside the cinder block deck stairs

Step 9Stain and walk it

Brush penetrating stain on every face of the treads and let it dry a day. Walk the stairs slowly the first few times and listen for a tread that rocks.

Walking up the finished block and cedar stairs to the deck

How Cinder Block Deck Stairs Hold Up

The blocks barely change. Cedar treads gray and wear on the front edges first, where shoes land, and need fresh stain every year or two.

Check each spring for a block that has crept outward, and reset it before the timbers shift.

FAQ

One step is taller than the others

Usually the bottom course wasn’t set into the gravel, or the deck isn’t an even number of block heights up. Adjust the base under the bottom course; the steps above can’t be changed without rebuilding.

A tread board bounces

The screws have loosened, or the board spans too far. Add screws, and keep the clear width between walls at 36 inches or less.

Do these need a handrail?

Under most codes, yes; four or more risers need a handrail 34 to 38 inches above the tread edges, and a high deck can need guards on the open sides too. A 4×4 post set in concrete at the bottom and bolted to the deck framing at the top will carry one.

Can I use mortar instead of adhesive?

Yes, and the walls will be stiffer. Dry-stacked with adhesive, they can come apart later if the deck is ever rebuilt.

Will frost heave them?

On a well-drained gravel base, small stairs like these usually ride out frost. We haven’t seen a hard winter on ours yet, so we can’t say how they’ll do.

The neighbor did borrow the wheelbarrow, for a weekend. It came back with a flat tire and a thank-you note taped to the handle.